Altrad Beaver 84 Salsburgh Supply Mammoth Brace System for Cofferdam Project

Hydraulic Mammoth Box

Altrad Beaver84 were approached by their client who was contracted to install new manholes for a large project in Motherwell, North Lanarkshire, measuring 13.5m x 5.8m.

The project required 2 large Manholes to be installed side by
side in tight working conditions. It was decided that the best Kit for the job were the Hydraulic Mammoth Frames and Larssen Sheet Piles. This would allow for the install of the Manholes at the same time, instead of the clients initial thoughts of doing them 1 at a time; which saved them time on site.

To ensure the project was a success, Altrad Beaver84 provided the temporary works design and all of the equipment required. The project was urgent for the client and so it was extremely important that Beaver84 were able to offer a quick turnaround, as well as competitive pricing.

The client’s director, Ian Orr stated, “As soon as Altrad Beaver 84 arrived on site they knew exactly what we required. Within 6 hours they had a temporary works design in place and delivery date for materials to arrive onsite. This was essential as the project was urgent. I was very impressed with the speed and efficiency of the work carried out. Well done Altrad Beaver 84 for having an extremely knowledgeable and efficient workforce.”