Beaverload Platform & Hoist

Benefits

  • Achieve maximum efficiency by freeing up your Tower Crane
  • Reduce labour costs by enabling simultaneous load out and build
  • Improve logistics with no on-site storage required
  • Save time with fast lift speeds of up to 120m/min
  • Train your Operators within 45 minutes

Features

  • Fully remote controlled system
  • Overload safety system and A2B protection
  • Custom made winches for precise and safe Operator control
  • Drive directly from the loading platform
  • One step loading of block work and dry wall
  • Uses 90% less power than a typical Tower Crane